> ## Documentation Index
> Fetch the complete documentation index at: https://docs.attensira.com/llms.txt
> Use this file to discover all available pages before exploring further.

# What to expect in your first eight weeks

> What you will see in weeks 1, 2, 4 and 8, in the order the signals can honestly appear: shipped work, crawler fetches, Search Console impressions, then citations and goals.

Before you pay, the plan step at signup shows four steps under the plan and budget: what you will see in weeks 1, 2, 4 and 8. The same four steps come back in your Monday note while the workspace is new, so the expectation you were given at signup is the one you are measured against afterwards.

The steps describe what we measure and report. They are not results we promise: what you pay for is the work, and work we don't deliver isn't charged. What the engines then do with it is something we measure, not something we control.

## The four steps

<Steps>
  <Step title="Week 1 · Shipped work">
    The agents ship the first changes, and the Monday note lists each one with a link.
  </Step>

  <Step title="Week 2 · Crawler fetches">
    We count how often AI crawlers fetch each changed page after it goes live.
  </Step>

  <Step title="Week 4 · Impressions">
    Search Console starts to report impressions for the changed pages, about two days behind.
  </Step>

  <Step title="Week 8 · Citations and goals">
    We report whether answers name or link you for the first time, and how each goal is pacing.
  </Step>
</Steps>

## Why it runs in this order

Each step is the earliest point at which that signal can honestly appear.

* **Work comes first** because it is the one thing fully in our hands. A pull request opened, a page rewritten, a pitch drafted: each is listed with a link the week it ships, and the same acts are on your [receipt](/account/receipt).
* **Crawler fetches come next** because a crawler has to fetch a changed page before an engine that searches the web can quote the new version. These are counts of fetches, not of answers. See [AI traffic](/traffic/ai-traffic) for why a fetch and a citation are different things.
* **Impressions follow** because Search Console reports with a delay of about two days, and a new or changed page takes time to be shown at all.
* **Citations and goal pace come last.** Answers change slowly, and some come from what a model learned months ago, so a citation or a goal moving is reported as what it is and never presented as the result of the work.

## Where you see it

**At signup.** On the plan step, under the plan and the budget, before you go to checkout, headed *What you'll see in your Monday note*. No week is marked yet.

**In the Monday note.** The Monday note carries the same four steps under *What to expect in your first eight weeks*, with the line "You are in week N". In the app, the step you have reached is also marked; the email lists the steps in order. The weeks count from the day the workspace was created, not from payment: week 1 is its first seven days, and the timeline stops showing after day 56. The first Monday note a workspace receives always carries the timeline. If that note comes after the eighth week, it shows the steps without a week number.

The signup page and the note use one shared set of steps, so they cannot describe different timelines. The note is the Monday edition of the [morning brief](/agent/morning-brief).

## When a signal cannot be measured

Two of the steps depend on something being connected. When it is not, the note says why in words, never with a zero that could mean "nothing happened".

| Step | Needs | Without it, the note says |
| - | - | - |
| Crawler fetches | The [AI traffic](/traffic/ai-traffic) crawler snippet installed on your site | We cannot count AI crawler fetches yet, because the crawler snippet is not installed on your site. |
| Impressions | Search Console connected to the workspace | Search Console is not connected, so impressions are not counted. |

If a change went live too recently for Search Console's reporting delay, the note says the change is still inside that delay. It does not print a zero.

Shipped work and citations need nothing extra. Citations come from the answers we already read for your [prompts](/tracking/prompts). Goal pace is shown for the goals your workspace has.

## Related

* [Your first fifteen minutes](/start/first-fifteen-minutes): the scan, the verdict and the first fix.
* [Before and after](/measure/before-and-after): how a change is measured once it ships.
* [Reading the numbers](/measure/reading-the-numbers): sample sizes, unmeasured cells, and when a change is real.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.